top of page
Energy Consulting - Redevelopment of a private residential building
2021

in collaboration with DBmLab  : Pasifika Group is an energy partner of DBmLab in the energy and structural redevelopment project of a residential tested building consisting of n. 3 real estate units. Pasifika Group experts will deal with the energy modeling of the building for the application of the Superbonus 110%. 

Circular Economy - Senior Partner of Er.EM. Earthworms Eco Management
2021

Pasifika Group is senior partner of Er.EM., the first Agro-Ecological company in Italy, an innovative start-up with a social vocation created to implement the GWP project (Green Worm Project), winner of national and European awards. With Er.EM. we intend to create a farm of earthworms fed with organic residues of various origins for the production of protein flours.

Environmental Consulting - technical committee of Cà di Capri landfill (Vr)
2017-2018

the PASIFIKA team of experts is a member of the technical control committee for the safety of the landfill for non-hazardous special waste Cà di Capri in Lugagnano, municipality of Sona (VR), as Technical Expert Advisor on behalf of Legambiente VR .

Environmental Consulting - technical committee of Cà di Capri landfill (Vr)
2017-2018

the PASIFIKA team of experts is a member of the technical control committee for the safety of the landfill for non-hazardous special waste Cà di Capri in Lugagnano, municipality of Sona (VR), as Technical Expert Advisor on behalf of Legambiente VR .

Circular Economy - Earthworms for the disposal of ORGANIC RESIDUES
2019

at WORM FARM ITALIA : the PASIFIKA team of experts has been commissioned to design and authorize an earthworm farm fed on by-products.

It is the first industrial plant in Italy (over 2,000 m2 of bedding) capable of handling 5,000 tons per year of organic material.

Environmental Design - AUA for car deposit
2019

at MARCO VOTA : Technical documents and Administrative Management for a Single Environmental Authorization Application for the creation of a judicial deposit. In particular, a system for the collection and treatment of rainwater has been designed with discharge into the soil by means of a battery of dispersing wells

Environmental Design - AIA for BIOMETHANE production plants fueled by FORSU in Sicily
2019

at GEOSTUDIO : the expert team of PASIFIKA has developed the technical documents necessary to start the AIA procedure of a pipeline of 3 plants for the production of BIOMETHANE to be fed into the network fueled by FORSU [biomethane + composting] in Sicily.

Progetto Energetico
Energy Consulting - Industrial Energy Audit (Findus)  
2019

at TEP - CSI : Energy Diagnosis of the agri-food industrial complex of Cisterna di Latina (LT). The production unit of central Italy represents the only plant for the production of frozen fish and vegetables for the whole of southern Europe. A complex and energy-intensive company already equipped with a natural gas trigeneration plant ..

Circular Economy - Earthworms for the disposal of ORGANIC RESIDUES
2019
Progetto Ambientale

at AZ.AGR. VIGNA COL DE L'OCA : PASIFIKA 's team of experts was commissioned to design and authorize an earthworm farm fed on by-products.

This is a fully operational plant that will occupy approximately 20,000 square meters of bedding and space dedicated to the storage of organic material and equipment.

at WORM FARM ITALIA : the PASIFIKA team of experts has been commissioned to design and authorize an earthworm farm fed on by-products.

It is the first industrial plant in Italy (over 2,000 m2 of bedding) capable of handling 5,000 tons per year of organic material.

Progetto Energetico
Energy Consulting - PV Assett Management  
2018-2019

at QUINTAS ENERGY : The professionals of the Pasifika team bring their skills to Andalucia in support of a world-class player in the management of photovoltaic parks. The experience and skills accumulated over the years are required in Andalusia to manage the Italian photovoltaic parks built with the different "energy accounts".

Progetto Ambientale
Circular Economy - Framework Agreement
2018

PASIFIKA's team of experts has reached a framework agreement with Conitalo for support and training in the creation of new earthworm farms. The partnership has a high strategic value and guarantees Pasifika and its customers the best of European know-how.

Progetto Ambientale
Environmental Design - EIA and AIA Screening for BIOMETHANE production plants fueled by FORSU in Emilia Romagna and Lombardia
2017-2018-2019

at GEOSTUDIO : the PASIFIKA team of experts has developed the technical documents necessary to start the VIA and AIA Screening procedure of a pipeline of systems for the production of BIOMETHANE to be fed into the network fueled by FORSU [no. 2 plants between Emilia Romagna and Lombardy]

Progetto Ambientale
Environmental Design - EIA and Screening for BIOMETHANE production plants fueled by FORSU in Lombardy and Lazio
2017-2018

at GEOSTUDIO : the expert team of PASIFIKA has developed the technical documents necessary to start the Screening and EIA procedure of a pipeline of plants for the production of BIOMETHANE to be fed into the network fueled by FORSU [no. 3 lifts between Lombardy and Lazio]

Progetto Ambientale
Progetto Energetico
Energy Economy - White Certificates (TEE) for photovoltaics
2017

at ESCOROMAGNA : the PASIFIKA team of experts has prepared the documentation to obtain the small-sized photovoltaic energy efficiency certificates in partnership with ESCOROMAGNA and BP INGEGNERIA.

Circular Economy - Earthworms for ORGANIC WASTE disposal
2017

at AGS and GARDAUNO : the PASIFIKA team of experts was commissioned to prepare a feasibility study and technical tests for feeding earthworms with biological sludge from the purification of waste water of civil origin.

at TEP Energy Solution [FINDUS & AIA Project] : the PASIFIKA team of experts was charged with preparing the technical tests for feeding earthworms with biological sludge from the purification of agro-industrial and pollen waste water.

Progetto Energetico
Progetto Ambientale
Energy Consulting - Industrial Energy Audit  
2016-2017

at EUROGAS : Energy Diagnosis of the Castelleone (CR) plant dedicated to the production of technical gases for the most varied sectors, in particular pharmaceutical and food. Eurogas, in fact, specializes in the primary production of Acetylene and Nitrous Oxide, as well as of the various blends.

Environmental Design - VIA and AUA for the recovery of ferrous and non-ferrous materials
2015 - 2016 - 2017

at PICCOLO BONAVENTURA : Design and Environmental Impact Study for the EIA Screening phase of a plant for the recovery of ferrous and non-ferrous materials, following which the technical-administrative documentation was prepared for an AUA instance aimed at strengthening the 'facility.

Progetto Ambientale
Progetto Energetico
Progetto Ambientale
Circular Economy - Feasibility Study for the Valorization of Organic Waste
2015

at FINDUS : Studies and Proposals for the valorization of the organic fraction of industrial waste and of the digestate from waste water purification of the Cisterna di Latina (LT) plant.

Feasibility study for the construction in FTT of an earthworm plant capable of treating 5,000 tons / year of organic waste.

Energy Consulting - Industrial Energy Audits
2015

at CSI - FINDUS : Energy Diagnosis of the Cisterna di Latina (LT) plant dedicated to the production of frozen vegetables and fish in various recipes.

at BIG GRANITI : Energy Diagnosis of the Rivoli Veronese (VR) plant dedicated to the production of stone / marble blocks and slabs.

at INALCA   : Energy Diagnosis of the Castelvetro Modenese (MO) and Ospedaletto Lodigiano (LO) plants dedicated to the slaughtering, processing and freezing of beef.

at ILPEA : Energy Diagnosis of the Malgesso (VA) plant dedicated to the production of magnetic and plastic components for household appliances.

at PLASTICA SUD   : Energy Diagnosis of the Sarno (SA) plant dedicated to the production of plastic food packaging.

Environmental Design - AUA for the recovery of plastic materials
March 2015

at PLASTICA SUD : Technical documents and administrative management for a single environmental authorization application for the construction of a plant for the recovery of plastic materials and return to the production cycle.

Progetto Ambientale
Environmental Design - AIA for the recovery of hazardous and non-hazardous waste
August 2014 (ongoing)

at ENVIRONMENTAL PROTECTIONS : Update and Renewal of the Integrated Environmental Authorization Application for the hazardous and non-hazardous waste recovery site.

Management of deadlines and environmental requirements regarding waste, air, water and soil.

Updating of the technical drawings of the activity (plans, layout, emergency plan, etc ...).

Preliminary assessment of the risk of fire.

Practice Register of Environmental Managers for the transport of hazardous and non-hazardous waste.

Progetto Ambientale
Environmental Design - AUA for the recovery of inert materials
2013 - 2014

at SCOMAN : Design and Authorization of a plant for the recovery of inert waste from civil works (construction / renovation of artefacts, road refurbishment, civil works in general ...).

The activity involved the design of a wastewater treatment system with delivery to the subsoil by means of batteries of dispersing wells, as well as a system to abate the poor.

Progetto Ambientale
Environmental Design - AUA for the construction of the municipal ecological island
2013

at ANACAPRI SERVIZI : Design and Authorization of the Municipal Ecological Island used for the delivery of waste by individual citizens and as an unloading / loading platform for waste leaving for mainland.

The activity envisaged the design of a waste treatment system with delivery to the sewer through a relay station, as well as a waste management system aimed at containing and reducing the volume.

bottom of page